,

New Ford Road Bridge Opens


Car drive over the new bridge span Friday afternoon. Credit: Tom Sofield/LevittownNow.com
Car drive over the new bridge span Friday afternoon.
Credit: Tom Sofield/LevittownNow.com

The new Ford Road bridge over I-95 in Bristol Township opened to vehicle traffic Friday afternoon.

The old bridge was closed July 2012 as it was too small too accommodate the widening of I-95 south. The bridge rebuilding project was done by Neshaminy Constructors Inc. of Feasterville, who were paid $5.7 million for the work.

Advertisements


The new bridge, which opened in the afternoon, features two 12-foot wide travel lanes, two 8-foot shoulders and a pedestrian sidewalk on the south side, according to the turnpike commission.

The widening of the southbound lane is part of the  I-95/I-276 Interchange project. The first stage of the start of the $500 million portion of the  project to connect the Turnpike to I-95. The multi-year project finally completing the nation’s original Interstate Highway System and improving travel through the Mid-Atlantic. Several other area bridges have been revamped because of the project.

A view of the new pedestrian walkway.  Credit: Tom Sofield/LevittownNow.com
A view of the new pedestrian walkway.
Credit: Tom Sofield/LevittownNow.com
Despite some dust on the road surface, the new bridge was a welcome relief for many commuters.  Credit: Tom Sofield/LevittownNow.com
Despite some dust on the road surface, the new bridge was a welcome relief for many commuters.
Credit: Tom Sofield/LevittownNow.com
Credit: Tom Sofield/LevittownNow.com
Credit: Tom Sofield/LevittownNow.com
Credit: Tom Sofield/LevittownNow.com
Credit: Tom Sofield/LevittownNow.com

Previous:

Report a correction via email | Editorial standards and policies