
Credit: Tom Sofield/LevittownNow.com
The new Ford Road bridge over I-95 in Bristol Township opened to vehicle traffic Friday afternoon.
The old bridge was closed July 2012 as it was too small too accommodate the widening of I-95 south. The bridge rebuilding project was done by Neshaminy Constructors Inc. of Feasterville, who were paid $5.7 million for the work.
Advertisements
The new bridge, which opened in the afternoon, features two 12-foot wide travel lanes, two 8-foot shoulders and a pedestrian sidewalk on the south side, according to the turnpike commission.
The widening of the southbound lane is part of the I-95/I-276 Interchange project. The first stage of the start of the $500 million portion of the project to connect the Turnpike to I-95. The multi-year project finally completing the nation’s original Interstate Highway System and improving travel through the Mid-Atlantic. Several other area bridges have been revamped because of the project.

Credit: Tom Sofield/LevittownNow.com

Credit: Tom Sofield/LevittownNow.com


Previous:


