,

Pennsbury To Hold First Design Review Sessions For New High School


Pennsbury High School’s East Campus. Credit: Tom Sofield/LevittownNow.com

As part of the Pennsbury School District’s planning process for a new high school, the district will hold two sessions to discuss design plans for the building’s athletics, music, and arts programs.

Advertisements


Superintendent Dr. Thomas Smith announced Tuesday via email that the high school’s coaches, directors, athletes, and students involved in athletics, music, and arts programs will have the opportunity to review the initial design for those spaces.

The first session will be held on August 7 at 5 p.m. in the high school’s East Auditorium and will cover designs for athletics, activities, and physical education.

The second session is scheduled for August 14 at 5 p.m. in the East Auditorium and will focus on designs for arts and performance programs.

Advertisements


“These dates coincide with the summer return of our athletic and marching band programs. Specific details regarding the daytime sessions will be provided to coaches and directors. The evening sessions are open to all interested individuals,” Smith wrote.

The KCBA Architects’ concept plan.

In the fall, the district plans additional sessions to review the plans for other parts of the building in Falls Township.

In March, the school board hired KCBA Architects on an $8.8 million contract to design the new high school.

Advertisements


Earlier this year, KCBA Architects presented a concept design known as the “Pennsbury Path,” that looked to create a versatile and environmentally sustainable building that enhances student safety, optimizes natural light, and improves on-site traffic flow.

A full design for the high school is still being worked up and will be presented to the public when completed.

The projected opening of the new high school is slated for winter 2029.

Advertisements


If all goes to the district’s plans, construction is anticipated to begin next year.

The school is expected to cover between 475,000 and 505,000 square feet and accommodate up to 2,800 students.

The projected total cost for the building is estimated to be between $240 million and $275 million.

Advertisements



Report a correction via email | Editorial standards and policies



Report a correction via email | Editorial standards and policies