
If you drive along Levittown Parkway and South Oxford Valley Road, you know it needs to be repaved. And it soon will be.
Advertisements
PennDOT confirmed to LevittownNow.com that the four-lane parkway will be starting next week.
Levittown Parkway and South Oxford Valley Road will be milled and repaved between Hood Boulevard and Southway Drive to Route 13. The work will span 3 miles through Falls Township, Bristol Township, and Tullytown Borough.

The work by PennDOT will lead to a lane closure on that stretch of roadway from Monday, October 3 to Friday, October 21 from 9 a.m. to 3 p.m.
Advertisements
Levittown Parkway and South Oxford Valley Road haven’t been repaved in more a dozen years. Despite crack sealing and filling potholes, the roadway has deteriorated in recent years.
The repaving project was listed on PennDOT District 6’s resurfacing plan for 2022.
Advertisements
Report a correction via email | Editorial standards and policies


