A waste conversion facility that serves part of Falls Township was damaged in an early Monday fire.
The fire happened around midnight at the Ecoremedy plant at the Morrisville Municipal Authority’s wastewater treatment plant on Riverview Avenue in Morrisville Borough, officials said.
Advertisements
The cause of the blaze that caused significant smoke damage was under investigation, officials said.
A statement from Ecoremedy said the fire happened in the storage area of he plant. It stated no operations were ongoing throughout the weekend.
The operation of the Ecoremedy plant was put on hold, the statement said.
Advertisements
The Morrisville Municipal Authority serves customers in Morrisville Borough and Yardley Borough along with portions of Falls Township and Lower Makefield Township.
Ecoremedy began operations with the Morrisville Municipal Authority in 2019. The facility turns biosolids and other waste organics into syngas, a entirely renewable source of thermal energy that replaces natural gas. The wastewater treatment plant expected to save money by using the Ecoremedy system.
Advertisements
Report a correction via email | Editorial standards and policies



