Double Lane Closures Scheduled On I-95 Monday Through Thursday


Double lane closures are scheduled for southbound I-95 between Veterans Highway (Route 413) and Street Road on Monday, April 2 through Friday, April 6 from 7 p.m. to 5 a.m.

Advertisements


The closures, according to PennDOT, are related to bridge deck repair and patching operations as part of a project to repair and resurface 13 miles of I-95 in Bensalem, Bristol, Middletown and Lower Makefield townships.

Under the improvement project, PennDOT isย milling, overlaying and rehabilitating existing pavement; performing base repairs; installing new guide rail; repairing or replacing damaged traffic signs; performing minor bridge deck repairs; and installing rumble strips and delineators along the I-95 corridor in Bucks County.ย The entire project is scheduled to be completed in the fall.

James J. Anderson Construction Company Inc. of Philadelphiaย is the general contractor on the $29,633,134 project, which isย financed withย 80 percent federal and 20 percent state funds.

Advertisements


Motorists are advised to allow extra time when traveling on southbound I-95 in the work area because backups and delays will occur. The contractorโ€™s schedule is weather dependent.



Report a correction via emailย |ย Editorial standards and policies